Hong Kong Note Printing Limited
TURNKEY's CRAC Installation Project for Hong Kong Note Printing Limited at Tai Po Industrial Estate
TURNKEY's CRAC Installation Project for Hong Kong Note Printing Limited at Tai Po Industrial Estate
TURNKEY was assigned to install the CRAC Systems for Hong Kong Note Printing Limited in 2014.
The most critical part of this project is to hoist the outdoor condenser on the rooftop of the premises and slab opening. In addition, the connection between Vertiv CRAC Systems to existing BMS system was also the most challenging part of this project.
[*] Vertiv Liebert Challenger 3000, 10 tonnes, 35kW